New approach to developing conceptual cost estimates for highway projects

Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364

Abstract

Developing a reliable project cost estimate is a challenge for any state highway agency (SHA), especially at the conceptual stage. A conceptual estimate is defined in this paper as the estimate prepared at the point at which only 30% of the design is complete. This paper describes a statistical approach to producing a reliable conceptual cost estimate when few project design details have been finalized and many assumptions still form the basis of the estimate. This approach used an analysis similar to the program evaluation and review technique (PERT), which is more commonly used in project scheduling, to assign certainty factors to cost estimates. The approach uses a combination of historical bid data for major roadway items whose quantities can be estimated early in the development process and historical percentages for other major components of the project, called allowance and contingency factors. The paper focuses on (1)the methodology developed to analyze the historical bid data; (2)the analysis of 14 highway corridors with 77 projects whose as-bid construction costs were more than $830million; and (3)a cross-validation of the approach used to validate the accuracy of the predictive model. By using a PERT-type technique, construction costs were accurately predicted at the conceptual stage within 20%. However, approximately 85% of the corridor costs were accurately predicted within 15% of the actual cost. The proposed methodology provides a structured and consistent estimating approach that can be used by any SHA that needs to develop total project delivery estimates at the conceptual design stage.

Item Type: Article
Uncontrolled Keywords: conceptual design; costs; estimation; highway and road construction; statistics
Index terms: project design, construction cost, programme evaluation and review technique, estimation, highway construction, road construction, statistics, estimate, cost estimate, project delivery, project scheduling, actual cost, accuracy, project cost, methodology, validation, agency, conceptual design, estimating
Subjects: mathematical modelling, operations research, project delivery, financial and cost management, contractual arrangements, civil engineering, economics, research methods, design practice, professional development, sociology, project controls
Topics: Design Practice, Time Control, Research Practice, Information Management, Engineering Principles, Cost Management, Procurement
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here