Doulabi, S H H; Seifi, A and Shariat, S Y (2011) Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Management, 137(2), pp. 137-146. ISSN 0733-9364
Abstract
Resource leveling problem is an attractive field of research in project management. Traditionally, a basic assumption of this problem is that network activities could not be split. However, in real-world projects, some activities can be interrupted and resumed in different time intervals but activity splitting involves some cost. The main contribution of this paper lies in developing a practical algorithm for resource leveling in large-scale projects. A novel hybrid genetic algorithm is proposed to tackle multiple resource-leveling problems allowing activity splitting. The proposed genetic algorithm is equipped with a novel local search heuristic and a repair mechanism. To evaluate the performance of the algorithm, we have generated and solved a new set of network instances containing up to 5,000 activities with multiple resources. For small instances, we have extended and solved an existing mixed integer programming model to provide a basis for comparison. Computational results demonstrate that, for large networks, the proposed algorithm improves the leveling criterion at least by 76% over the early schedule solutions. A case study on a tunnel construction project has also been examined.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction project; resource leveling; resource management; scheduling; splitting |
| Index terms: | repair, construction project, programming, mixed integer, scheduling, genetic algorithm, resource management, project management, resource levelling, tunnel construction, heuristic, case study |
| Subjects: | civil engineering, maintenance engineering, algorithms, project management theory and practice, production management, mathematical modelling, risk assessment, data collection methods, control systems, programming, operations research, resource management |
| Topics: | Business Strategy, Engineering Principles, Research Practice, Project Management, Risk Management, Digital Applications, Time Control, Site Management |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here