Hong, T; Cho, K; Hyun, C and Han, S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management, 137(6), pp. 393-402. ISSN 0733-9364
Abstract
Many existing studies about construction schedule management focus on the planning phase of a project, particularly on schedule estimation based on the labor resources involved in the project. However, equipment resources, which are another crucial factor in the productivity of a construction project, have not been considered in existing research. Therefore, this study aimed to develop a schedule estimation model considering both labor and equipment resources. For the purpose of this study, core wall construction was selected because it is a very important construction activity in terms of schedule estimation for high-rise building construction. To develop a schedule estimation model for core wall construction, an in-depth case study was conducted. On the basis of the results of the case study, a simulation model was developed using the CYCLONE method. Finally, by using the results of the simulation, a schedule estimation model for core wall construction was developed by conducting multiple-regression analysis. By using the developed model, a project manager can easily, quickly, and accurately perform schedule estimation when there are problems that may cause construction schedule delays during the construction phase.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | core walls; high-rise buildings; scheduling; simulation |
| Index terms: | estimation, construction activity, productivity, cyclone, case study, project manager, schedule delay, labour resource, construction phase, multiple-regression, scheduling, high-rise building, construction project |
| Subjects: | business economics, project controls, statistical analysis, management, production management, operations research, project delivery, financial and cost management, construction operations, data collection methods, profession, construction type, climate science |
| Topics: | Roles and Professions, Construction Technology, Sustainability, Cost Management, Business Strategy, Research Practice, Project Management, Time Control, Site Management |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here