Improving supply chain management in construction: What can be learned from the aerospace industry?

Voordijk, H and Vrijhoef, R (2003) Improving supply chain management in construction: What can be learned from the aerospace industry? In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Abstract

In order to provide for controllable delivery, reliable lead times and efficient customer response, lean manufacturing and platform assembly practices play an important role in supply chains in the aerospace industry. The adoption of lean manufacturing practices ensures an efficient delivery of products to the market. Benefits from the development of platform strategies are a more reliable materials supply and an improved logistics control. The aerospace industry is characterized by a small number of major global players and many small ones. A major part of the design and production has been contracted out to suppliers. In this paper the basic similarities and differences between the construction and aerospace industry and supply chains are analysed. A comparative study of aerospace and construction supply chains is presented to indicate and discuss the applicability of supply chain management concepts to construction, and the improvement potential of these concepts regarding supply chain management in construction. It is concluded that in particular the practice of platform assembly is a fruitful concept to be applied in the construction industry.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: aerospace industry; construction industry; virtual organization; supply chain management
Index terms: strategy, platform, construction industry, comparative study, lead time, lean manufacturing, virtual organization, construction supply chain, aerospace industry
Subjects: research design and methodology, construction logistics, management, manufacturing engineering, digital design, project controls, information systems, industry analysis
Topics: Time Control, Digital Applications, Supply Chain Management, Business Strategy, Engineering Principles, Research Practice
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here