Requirement and availability time-window analysis of intermediate function

Song, Y and Chua, D K H (2011) Requirement and availability time-window analysis of intermediate function. Journal of Construction Engineering and Management, 137(11), pp. 967-975. ISSN 0733-9364

Abstract

Many existing resource-constrained scheduling tools may be inadequate for representing and evaluating intermediate functions, a major category of construction requirements, with respect to availability time-windows and alternative construction sequences. This study develops a time-window analysis approach for calculating and matching the requirement and availability time-windows of an intermediate function. Consequently, the proposed analysis approach can facilitate planning engineers to formally detect unfulfilled construction requirements residing in a construction schedule. Moreover, the analysis tool can also be used for accommodating alternative construction sequences to work out better construction schedules, which is demonstrated and validated by using the case of constructing a nursing house.

Item Type: Article
Uncontrolled Keywords: construction requirement; construction sequence; intermediate function; precedence relationship; resource-constrained scheduling
Index terms: precedence relationship, scheduling, window, engineer
Subjects: operations research, architectural elements, profession
Topics: Time Control, Design Practice, Roles and Professions
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here