Causes of variation in construction project task starting times and duration

Wambeke, B W; Hsiang, S M and Liu, M (2011) Causes of variation in construction project task starting times and duration. Journal of Construction Engineering and Management, 137(9), pp. 663-677. ISSN 0733-9364

Abstract

In this research, variation is defined as the time difference between what was planned and what actually happened in terms of task starting times and duration. Variation in construction tasks is important as it can impact productivity performance. Construction projects consist of a large number of interdependent tasks. When the starting time and/or duration of one task varies, it can affect other downstream tasks and result in disruptions to the schedule and/or decreased productivity. The construction process is complex and involves numerous people with different levels of responsibility, which makes identifying the root causes of the variation difficult. A nationwide survey was administered to workers, foremen, and project managers to identify the most prevalent causes and magnitude of both starting time and task duration variation. Fifty individual causes of variation were divided into eight categories: prerequisite work, detailed design/working method, labor force, tools and equipment, material and components, work/job site conditions, management/supervision/information flow, and weather or external conditions. This research examined the similarities and differences in perceptions between craft workers, foremen, and project managers in terms of starting time and task duration variation. The top eight causes of starting time variation and top nine causes of task duration variation were identified. The research also quantitatively analyzed the underlying structure of the causes of variation using factor analysis. This was done by grouping the 50 individual causes into nine orthogonal factors that represent the underlying structure of the affecting causes. The findings will help construction project managers and field managers focus on the root causes of variation during planning in order to develop effective strategies to reduce variation and improve project productivity performance.

Item Type: Article
Uncontrolled Keywords: construction; factor analysis; labor productivity; variation
Index terms: information flow, survey, strategy, labour force, manager, weather, construction project, variation, construction process, productivity, project manager, supervision, duration, factor analysis, labour productivity
Subjects: practitioner, control systems, profession, data collection methods, air quality, contractual condition, production management, management, economics, statistical analysis, information systems, project controls, building construction
Topics: Roles and Professions, Sustainability, Business Strategy, Research Practice, Project Management, Time Control, Contract Administration, Site Management, Digital Applications, Supply Chain Management
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here