Xu, J and Zeng, Z (2011) Applying optimal control model to dynamic equipment allocation problem: Case study of concrete-faced rockfill dam construction project. Journal of Construction Engineering and Management, 137(7), pp. 536-550. ISSN 0733-9364
Abstract
This paper presents an optimization method for solving a dynamic equipment allocation problem (DEAP) encountered during the implementation of a concrete-faced rockfill dam construction project. In contrast to prior studies, the uncertainties associated with equipment failures have been explicitly considered in the objective function of our mathematical model that maximizes construction throughput. Specifically, our research assumes that the equipment failure time is characterized by a Weibull distribution, which has been justified by a chi-square goodness-of-fit test. A failure probability-work time equation is also used to characterize the relationship between the equipment failure probability and mean time to work. Furthermore, our model considers multiple types of equipment, and each is capable of doing different jobs. The model is confined by the relationship equations, initial conditions, and constraint conditions. Then, the particle swarm optimization (PSO) technique is applied to search for the optimal solution of the DEAP. Finally, the Shuibuya Hydropower Project was used as a real-world example to demonstrate the practicality and efficiency of the optimization method.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction equipment; dynamic models; optimization |
| Index terms: | mathematical model, dam construction, efficiency, hydropower project, construction equipment, case study, implementation |
| Subjects: | construction type, data collection methods, mathematical modelling, contractual arrangements, infrastructure engineering, construction equipment, performance management |
| Topics: | Quality Management, Construction Technology, Procurement, Plant and Equipment, Research Practice, Engineering Principles |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here