Alvanchi, A; Lee, S and Abourizk, S (2012) Dynamics of working hours in construction. Journal of Construction Engineering and Management, 138(1), pp. 66-77. ISSN 0733-9364

Abstract

The effects of different aspects of working hours on performance, including length of work and rest periods, time of day, and amount of set overtime, have been studied separately by scholars from different disciplines, including construction. Most of these studies have accounted for specific factors and for specific types of work. Current approaches fall short of enabling a work manager to estimate the impact of various working-hour arrangements on productivity with a reasonable degree of accuracy. We have developed a dynamic modeling tool that can be used for estimating expected productivity in a range of construction jobs for different working-hour arrangements. Through this dynamic modeling tool, construction managers can see the expected effects of working-hour changes on productivity and adjust work-hour schedules to improve productivity. To test the applicability of the model, it has been applied to a real construction case, and the effects of different working-hour arrangements on productivity have been investigated.

Item Type: Article
Uncontrolled Keywords: construction management; distributed processing; feedback control; hybrid methods; shift work; simulation
Index terms: productivity, estimate, dynamics, accuracy, manager, dynamic modelling, estimating, working hours, construction manager
Subjects: financial and cost management, modelling and simulation, practitioner, profession, systems engineering, employment law, professional development, management
Topics: Engineering Principles, Information Management, Business Strategy, Cost Management, Roles and Professions, Legal Issues
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here