Analysis of the higher-order partial correlation between CII best practices and performance of the design phase in fast-track industrial projects

Deshpande, A S; Salem, O M and Miller, R A (2012) Analysis of the higher-order partial correlation between CII best practices and performance of the design phase in fast-track industrial projects. Journal of Construction Engineering and Management, 138(6), pp. 716-724. ISSN 0733-9364

Abstract

A fast-track project delivery strategy is designed to leverage the ability to execute the design, procurement, and construction phases simultaneously to substantially reduce the overall project duration. The successful execution of the design phase in fast-track projects is especially challenging because the concurrent execution of design and construction interferes with the inherently iterative nature of the design process. In this research, it was hypothesized that a correlation exists between the use of some of the Construction Industry Institute (CII) best practices and the performance of design phase in fast-track projects. Analysis of the performance of the design phase in 31 fast-track projects revealed a statistically significant correlation between performance of the design phase and front-end planning, alignment, constructability, and change management. The results of quantitative analysis are supported by qualitative analysis of data, opinion of experts from industry, and academia. The projects analyzed in the study were executed by CII member companies with experience and knowledge of using the best practices effectively.

Item Type: Article
Uncontrolled Keywords: alignment; constructability; fast track; preproject planning
Index terms: design and construction, design phase, academia, best practice, project delivery, duration, construction phase, constructability, Construction Industry Institute, qualitative analysis, quantitative analysis, design process, change management, strategy
Subjects: research organizations, research design and methodology, business, design methods, data analysis and analytics, contractual arrangements, professional practice, project delivery, management, construction integration, project controls, educational institutions
Topics: Business Strategy, Research Practice, Project Management, Procurement, Design Practice, Education, Time Control, Organizational Design
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here