Distinction between team-based self-esteem and company-based self-esteem in the construction industry

Ding, Z; Ng, F; Wang, J and Zou, L (2012) Distinction between team-based self-esteem and company-based self-esteem in the construction industry. Journal of Construction Engineering and Management, 138(10), pp. 1212-1219. ISSN 0733-9364

Abstract

Organization-based self-esteem has been a key construct in organizational management research since it was proposed in 1989. However, this paper proposes that organization-based self-esteem should be further refined as team-based self-esteem and company-based self-esteem, particularly in the construction industry. The construct of team-based self-esteem is defined and distinguished from companybased self-esteem. On the basis of survey data and results of exploratory, confirmatory factor analysis and structural equation modeling, the convergent, discriminant, and predictive validity of team-based self-esteem and company-based self-esteem is tested and verified. The results show that team-based self-esteem is more salient than company-based self-esteem and has better predictive power in the construction project team context. The significant implication is that research of self-esteem in the construction industry should measure self-esteem depending on the research context, for example, team-based instead of company-based self-esteem, in project management research.

Item Type: Article
Uncontrolled Keywords: China; organization-based self-esteem; project management; self-esteem; team-based self-esteem; teamwork
Index terms: teamwork, construction project team, validity, construction industry, project management, organizational management, structural equation modelling, survey, confirmatory factor analysis, China
Subjects: project delivery, data collection methods, evaluation and assessment methods, business, industry analysis, statistical analysis, management, Geography, project management theory and practice
Topics: Project Management, Geographical Context, Research Practice, Organizational Design
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here