Li, X and Chen, X (2012) Using grouting of shield tunneling to reduce settlements of overlying tunnels: Case study in Shenzhen metro construction. Journal of Construction Engineering and Management, 138(4), pp. 574-584. ISSN 0733-9364
Abstract
Grouting control of shield tunneling is of paramount importance to reduce settlements of existing tunnels below-passed by shield tunneling along a curved alignment and in crowded urban areas. The methodology and scheme of the grouting control of shield tunneling is illustrated taking the first Earth Pressure Balanced (EPB) shield below-crossing existing interval tunnels from Kexueguan station to Dajuyuan station of the Shenzhen metro line No. 1, for example. A combination methodology of the observational method and the predefined design method was set up to deal with parameters concerning the grouting control of shield tunneling. Some parameters of the grouting control were predefined or suggested before the below-crossing, and other parameters might be adjusted during construction on the basis of the observational method. The scheme primarily consists of preparation work before the below-crossing, automatic motoring system used in operation tunnels, simultaneous backfilling grouting and grouting directly through segment holes. For the simultaneous backfilling grouting, enough grouting was filled in the tail void with shield advance. With the help of automatic motoring system, the grouting directly through segment holes was employed in light of the measured settlements of existing tunnels. The maximum of the final measured settlements of existing tunnels is about 70% of the predefined allowable settlement of 20mm, which shows that the grouting control of shield tunneling is effective in reducing settlements of existing tunnels. The grouting practice can be used as references in similar conditions.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | automatic monitoring system; epb shield tunneling; existing tunnels; grouting through segment holes; settlement control; simultaneous backfilling grouting |
| Index terms: | methodology, urban area, observation, tunnel, design method, grouting, monitoring, case study |
| Subjects: | infrastructure and transport systems, urban form and morphology, research methods, construction methods, design methods, control systems, data collection methods |
| Topics: | Research Practice, Engineering Principles, Site Management, Design Practice, Urban Studies |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here