Pan, W; Dainty, A R J and Gibb, A G F (2012) Establishing and weighting decision criteria for building system selection in housing construction. Journal of Construction Engineering and Management, 138(11), pp. 1239-1250. ISSN 0733-9364
Abstract
A lack of value-based decision criteria leads to an inability to effectively compare prefabrication and off-site production with conventional construction, which inhibits the realization of benefits of off-site approaches. This paper develops value-based decision criteria and quantifies their relative importance for assessing building technologies systematically. The research employed a multimethodological strategy within a broad case-study-based design, with six large house-building organizations in the United Kingdom. These companies together accounted for more than one-tenth of new-build home completions in the United Kingdom. More than 50 criteria were developed, grouped under cost, time, quality, health and safety, sustainability, process, procurement, and regulatory and statutory acceptance. Cost was ranked most important, which, coupled with time and quality, predominated technology selection in these companies. Sustainability, process, and procurement were weighted lower, whereas health and safety and regulatory and statutory acceptance were deemed compulsory, hence offering no trade-off opportunity. A lack of incorporating innovative sustainable technology into corporate strategy was observed. The developed criteria and the systematic process should help house-building organizations manage technological innovation and hopefully achieve more informed corporate decisions.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction management; construction methods; decision criteria; decision making; off-site production; prefabrication; residential housing; United Kingdom |
| Index terms: | corporate strategy, value-based decision, residential construction, technological innovation, decision criteria, off-site production, building system, prefabrication, building technology, health and safety, relative importance, residential housing, construction method, strategy, United Kingdom, decision-making |
| Subjects: | manufacturing engineering, management, tendering, construction integration, Geography, health safety and environment, decision analysis, building construction, construction type, risk assessment, business, engineering systems, innovation and technology management |
| Topics: | Site Management, Engineering Principles, Geographical Context, Health and Safety, Business Strategy, Governance, Procurement, Construction Technology, Risk Management |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here