Abstract
This study compares and analyzes the relationship of design-build (DB) and design-bid-build (DBB) project delivery methods with performance metrics of large highway projects (> $50 million). Project performance is measured in cost, schedule, and change orders on these two types of highway projects. This study also investigates associations between project characteristics (input variables) and project performance (output variables) of large highway projects. The performance comparison methodology used here is derived from work done on a Texas Department of Transportation study of the State Highway 130 Project. The study results show that the construction speed and project delivery speed per lane mile (or lane kilometer) of DB projects were significantly faster than that of DBB projects for this sample. The study also showed that out of 21 inputs analyzed, 14 inputs have statistically significant associations with one or more outputs of these projects.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | comparison; design-bid-build; design-build; inputs; outputs; performance |
| Index terms: | project delivery, project performance, highway construction, change order, design-bid-build, methodology, performance metric |
| Subjects: | project delivery, contractual arrangements, civil engineering, research methods, performance measurement, project management theory and practice, contractual condition |
| Topics: | Project Management, Research Practice, Engineering Principles, Procurement, Quality Management, Contract Administration |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here