Taylor, T R B; Ford, D N and Reinschmidt, K F (2012) Impact of public policy and societal risk perception on US civilian nuclear power plant construction. Journal of Construction Engineering and Management, 138(8), pp. 972-981. ISSN 0733-9364
Abstract
Due to the increasing demand for energy in the United States, the Nuclear Regulatory Commission is currently reviewing permit applications for 26 new nuclear power reactors. However, the previous generation of U.S. civilian nuclear plant construction experienced significant cost and schedule overruns. Previous research identified "regulatory ratcheting" (continuous, retroactive change in nuclear plant regulations) as one of the primary causes of this poor performance. Regulatory ratcheting was enabled by the nuclear industry's two-step permitting and licensing process for civilian power plant construction, which allowed society's perception of the risks associated with nuclear plant operation to impact nuclear plant construction. How will public policy and societal risk perception affect the next generation of U.S. civilian nuclear plant construction? This question is investigated using a dynamic simulation model of the public policy and social feedback processes that impact U.S. nuclear plant construction. The research reveals that proposed strategies to address public policy and societal issues, such as a new nuclear regulatory process and smaller, less expensive reactors, may not prevent cost and schedule overruns on the planned next generation of nuclear plants. Results point to the critical role societal perceptions of nuclear power risk play in nuclear construction project success.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | dynamic models; nuclear reactors; public policy; risk management; simulation models; system analysis |
| Index terms: | schedule overrun, nuclear industry, risk management, risk perception, power station construction, licensing, strategy, United States, nuclear power, society, public policy, construction project, regulation |
| Subjects: | industry analysis, communities and social development, political science, environmental hazards, project controls, Geography, production management, management, civil engineering, energy systems, public policy, knowledge transfer, risk assessment |
| Topics: | Digital Applications, Time Control, Engineering Principles, Project Management, Geographical Context, Research Practice, Business Strategy, Governance, Sustainability, Stakeholder Management, Risk Management |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here