El Asmar, M; Hanna, A S and Loh, W Y (2013) Quantifying performance for the integrated project delivery system as compared to established delivery systems. Journal of Construction Engineering and Management, 139(11): 4013012, ISSN 0733-9364
Abstract
Integrated project delivery (IPD) is an emerging construction project delivery system that collaboratively involves key participants very early in the project timeline, often before the design is started. It is distinguished by a multiparty contractual agreement that typically allows risks and rewards to be shared among project stakeholders. Because IPD is becoming increasingly popular, various organizations are expressing interest in its benefits to the architecture/engineering/construction (AEC) industry. However, no research studies have shown statistically significant performance differences between IPD and more established delivery systems. This study fills that missing gap by evaluating the performance of IPD projects compared to projects delivered using the more traditional design-bid-build, design-build, and construction management at-risk systems, and showing statistically significant improvements for IPD. Relevant literature was analyzed, and a data collection instrument was developed and utilized in detailed interviews to gather quantitative performance data from 35 recently completed projects. Univariate data analyses, such as t-tests and Mann-Whitney-Wilcoxon tests, were performed to evaluate IPD performance. The results indicate that IPD achieves statistically significant improvements in 14 metrics across six performance areas: quality, schedule, project changes, communication among stakeholders, environmental, and financial performance. The major contribution of this paper is demonstrating that IPD provides higher quality facilities faster and at no significant cost premium. These results would be extremely valuable in the hands of decision makers to enable them to choose the appropriate delivery system for their projects.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | contracting; innovative delivery methods; integrated project delivery; performance metrics |
| Index terms: | financial performance, project stakeholder, integrated project delivery, performance areas, construction project delivery, interview, performance metric, data analysis, delivery method, design-bid-build, becoming |
| Subjects: | philosophical process, sociology, project controls, delivery method, business analysis, performance measurement, data analysis and analytics, contractual arrangements, operations management, data collection methods |
| Topics: | Quality Management, Time Control, Business Strategy, Research Practice, Project Management, Stakeholder Management, Procurement |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here