Hanna, A; Boodai, F and El Asmar, M (2013) State of practice of building information modeling in mechanical and electrical construction industries. Journal of Construction Engineering and Management, 139(10): 04013009, ISSN 0733-9364
Abstract
The North American construction industry has seen a decline in productivity for decades due to various reasons, including a lack of collaboration and the increase in the complexity of systems. These problems are most visible in labor-intensive trades, such as mechanical and electrical construction. Within the last decade, building information modeling (BIM) has emerged as a potential solution to these problems. This paper attempts to highlight the state of practice of BIM in the mechanical and electrical industries. By analyzing responses from an extensive survey and interview process, this paper reaches three key conclusions, namely, (1) 59% of mechanical and electrical contractors that use BIM have 3 years or less of BIM experience; (2) contractors should use one to three BIM staff members and add 1-2% of total project-cost estimates to account for BIM implementation; and (3) more than 70% of mechanical and electrical contractors that have used BIM agree that BIM reduces field conflicts and improves coordination. These findings can help mechanical and electrical construction firms understand the evolving use of BIM and allocate resources appropriately.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | building information models; construction methods; electrical construction; mechanical construction; project planning and design |
| Index terms: | construction firm, construction method, survey, interview, project planning, complexity, collaboration, productivity, building information modelling, coordination, cost estimate, construction industry, implementation |
| Subjects: | contractual arrangements, financial and cost management, control systems, data collection methods, organization, industry analysis, systems engineering, information systems, building construction, management |
| Topics: | Procurement, Cost Management, Business Strategy, Engineering Principles, Project Management, Research Practice, Site Management, Organizational Design, Digital Applications |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here