Preliminary engineering cost estimation model for bridge projects

Hollar, D A; Rasdorf, W; Liu, M; Hummer, J E; Arocho, I and Hsiang, S M (2013) Preliminary engineering cost estimation model for bridge projects. Journal of Construction Engineering and Management, 139(9), pp. 1259-1267. ISSN 0733-9364

Abstract

This paper addresses one of the costs of new bridges, i.e., the cost of doing the preliminary engineering (PE). This particular aspect of cost has largely been neglected because of the difficulty in obtaining appropriate data. Typically, PE costs are determined as a percentage of construction costs, disregarding other project-specific parameters. Bridge projects let by the North Carolina (NC) DOT between 2001 and 2009 were reviewed. From an analysis of these 461 projects, the writers developed statistical models linking variation in PE costs with distinctive project parameters. The primary contribution this paper makes to the body of knowledge is the finding that PE cost estimates for bridge projects are commonly and significantly underestimated. The writers found that bridge projects exhibited a mean PE cost ratio of 28%. This result is significantly greater than the percentage used in practice. An investigation of data sources related to bridge projects, a description of regression techniques applied to predict the PE cost of such projects, and an assessment of the predictive performance of models are addressed in this paper. New knowledge contributions include identification of key factors affecting the PE costs of bridges, illustration of how those key factors enabled us to predict PE costs of future projects, and discussion of the data collection problems that hindered model development. The writers' PE cost analyses and predictive modeling effort relate to infrastructure funding issues. All of the parties involved in infrastructure construction, from legislators to contractors, must understand costs and have confidence in the cost estimates developed to ensure efficient and effective funding of infrastructure projects. This paper on bridge PE costs addresses one component of infrastructure funding.

Item Type: Article
Uncontrolled Keywords: bridges; budget control; cost estimation; design; infrastructure; planning; preconstruction; preliminary engineering; project planning and design; regression
Index terms: bridge project, cost estimate, infrastructure project, statistical model, funding, investigation, construction cost, model development, body of knowledge, infrastructure construction, project planning, variation, cost analysis, predictive modelling, cost estimating
Subjects: financial and cost management, analytical methods, economic analysis, prediction and forecasting, data science, knowledge management, data collection methods, control systems, infrastructure and transport systems, civil engineering, contractual condition
Topics: Cost Management, Business Strategy, Research Practice, Project Management, Information Management, Engineering Principles, Contract Administration
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here