Kang, Y; O'Brien, W J; Dai, J; Mulva, S P; Thomas, S P; Chapman, R E and Butry, D (2013) Interaction effects of information technologies and best practices on construction project performance. Journal of Construction Engineering and Management, 139(4), pp. 361-371. ISSN 0733-9364
Abstract
Building from considerable empirical research in the general business literature, this paper quantitatively explores the view that the benefits of information technologies manifest themselves through improvement in work processes. In turn, better work processes lead to increased project performance. Using an overall sample of 133 projects (missing data make specific correlation sample sizes smaller) from the Construction Industry Institute Benchmarking and Metrics database, this paper analyzes correlations between technology use and integration, best practices, and project performance measured with cost, schedule, and rework metrics. Data are also used to assess the complementary interaction between technology use, work processes as measured by best practices, and performance. The findings show that there are limited significant beneficial correlations between information technology use and performance, slightly more significant beneficial correlations between best practice use and performance, and several significant correlations between information technology use and application of Best practices. Interaction effects of the combined use of information technologies and best practices against performance are assessed, finding several positive correlations, although limited data availability prevents robust statistical evaluation. Overall, the paper concludes there is evidence that the benefits of information technologies in construction are found through changes in work processes. This paper thus challenges more common approaches that attempt to directly correlate the impact of information technology use on project performance with corresponding implications for both academic and industrial attempts at assessment.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | best practice; computer-aided projects management; information technology; interaction effects; performance evaluation |
| Index terms: | rework, information technology, benchmarking, performance evaluation, integration, construction project, evidence, sample size, database, Construction Industry Institute, interaction, best practice, project performance |
| Subjects: | behavioral psychology, organizational analysis, data management, project management theory and practice, production management, performance measurement, operations management, computing systems, business, research design and methodology, evaluation and assessment methods, research organizations |
| Topics: | Digital Applications, Quality Management, Organizational Design, Business Strategy, Project Management, Research Practice |
| Descriptive scope: | 3 PCA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here