Marzouk, M and Amin, A (2013) Predicting construction materials prices using fuzzy logic and neural networks. Journal of Construction Engineering and Management, 139(9), pp. 1190-1198. ISSN 0733-9364
Abstract
Changes in construction materials prices have a great impact on the cost of construction projects. Such changes in prices occur randomly at different rates over time. There is no clear relationship that can be used to provide accurate calculations of materials prices. One of the biggest problems that faces the construction contracts is unbalanced rights and obligations between owners and contractors (the two parties of construction contracts). It is necessary to have a system that is capable of estimating the size and amount of the change in materials prices at reasonable accuracy. There is also a need to predict the change in building materials prices (either increase or decrease) during the execution phase of the project as well as during the preparation of tenders. Thus, determination of the appropriate lead time to order needed building materials to execute various activities could be done. This research presents a system that utilizes fuzzy logic to identify construction materials that are most sensitive to the change in prices. The research proposes a methodology for identification of construction materials that are most sensitive to the change in prices to be used in modifying the contract price with an attempt to predict the amount of future change in materials prices using neural networks technique. To achieve this objective, the research classifies construction cost items into four different components (building materials, equipment, labor, and administrative expenses), which represent the basic cost elements of any cost item. The system is based on the study of the changes in materials prices that occurred in the Egyptian market from 2000 to 2010. It also provides the impact on the prices of cost items in the priced bill of quantities (BOQ), which is determined by the change in prices of cost items' materials and their share percent on forming the cost item. Getting to identify materials' share in the bill of quantities' items has a great influence on the price of the cost item and the priority in ordering these materials according to their impact on the item's price. The developed system aids construction contractors in studying bids during the tendering stage and procurement planning during the project's execution. It can also be used by owners' representatives to estimate the expected total cost of upcoming projects. The system data are obtained from the Central Agency for Public Mobilization and Statistics in Egypt through published periodicals. A numerical example is presented to demonstrate the use of the proposed system.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction materials prices; cost estimating; fuzzy logic; neural networks; quantitative methods |
| Index terms: | fuzzy logic, owner, construction cost, building material, lead time, construction contract, construction material, periodical, estimate, bills of quantities, Egypt, statistics, cost estimating, accuracy, neural network, face, quantitative method, methodology, construction project, estimating, construction contractor, agency |
| Subjects: | data analysis and analytics, data science, artificial intelligence, financial and cost management, psychology, building materials, practitioner, research dissemination and communication, contract type, mathematical modelling, project controls, sociology, Geography, production management, professional development, research methods |
| Topics: | Procurement, Roles and Professions, Stakeholder Management, Research Practice, Geographical Context, Project Management, Engineering Principles, Information Management, Cost Management, Time Control, Organizational Design, Design Practice, Digital Applications |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here