Shahandashti, S M and Ashuri, B (2013) Forecasting Engineering News-Record construction cost index using multivariate time series models. Journal of Construction Engineering and Management, 139(9), pp. 1237-1243. ISSN 0733-9364
Abstract
The construction cost index (CCI), which has been published monthly in the United States by Engineering News-Record (ENR), is subject to significant variations. These variations are problematic for cost estimation, bid preparation, and investment planning. The accurate prediction of CCI can be invaluable for cost estimation and budgeting of capital projects, and can result in accurate bids. The research objective of this paper is to create appropriate multivariate time series models for forecasting CCI based on a group of explanatory variables that are identified by using Granger causality tests. The results of cointegration tests recommend vector error correction (VEC) models as the proper type of multivariate time series models to forecast CCI. Several VEC models are created and compared with existing univariate time series models for forecasting CCI. It is shown that the CCI predicted by these VEC models is more accurate than that predicted by the previously proposed univariate models (i.e., seasonal autoregressive integrated mean-average and Holt-Winters exponential smoothing). The comparisons are based on two typical error measures: mean absolute prediction error and mean squared error. The primary contribution of this research to the body of knowledge is the creation of multivariate time series models that are more accurate than the current univariate time series models for forecasting CCI. It is expected that this work will contribute to the construction engineering and management community by helping cost engineers and capital planners prepare more accurate bids, cost estimates, and budgets for capital projects.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction cost; forecasting; multivariate time series; quantitative methods |
| Index terms: | capital project, construction engineering, planner, cost estimate, forecasting, engineer, construction cost, smoothing, variation, construction cost index, quantitative method, body of knowledge, bid preparation, time series, United States, Granger causality test, winter, cointegration, cost estimating, budgeting |
| Subjects: | factor and component analysis, financial management, engineering methods, Geography, contractual condition, cost indicators, data analysis and analytics, knowledge management, bidding, data science, economic analysis, prediction and forecasting, strategic project management, financial and cost management, profession, climate science |
| Topics: | Engineering Principles, Information Management, Research Practice, Geographical Context, Project Management, Business Strategy, Cost Management, Sustainability, Procurement, Roles and Professions, Design Practice, Contract Administration |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here