Wanberg, J; Harper, C; Hallowell, M R and Rajendran, S (2013) Relationship between construction safety and quality performance. Journal of Construction Engineering and Management, 139(10): 04013004, ISSN 0733-9364
Abstract
It is well established that the project cost, quality, safety, and duration are the four critical elements that contribute to project success. Past literature has established theoretical relationships between construction safety and quality on the basis of opinions of industry experts. This is the first empirical inquiry into the relationship between safety and quality, testing the null hypothesis that there is no statistical relationship among quality performance indicators and safety performance indicators. To test this hypothesis, empirical data were collected from 32 building construction projects, ranging in scope from $50,000 to $300 million dollars. Several quality metrics (e.g., cost of rework per $1M project scope and rate of rework per 200,000 worker-hours) were used as predictor variables and first aid and Occupational Safety and Health Administration (OSHA) recordable injury rates were used as response variables. Linear regressions among the predictor and response variables showed that there are two statistically significant relationships: the OSHA recordable injury rate is positively correlated to rework (r2=0.968; p-value=0.032) and the first aid rate is positively correlated to number of defects (r2=0.548; p-value=0.009). To understand why these relationships exist and to identify specific strategies that promote both safety and quality, open-ended interviews were conducted with project managers. These individuals indicated that the most compelling reason for the strong positive correlation between rework and injuries is the fact that rework involves demolition, schedule pressure, and unstable work processes. They also noted that devoting resources to preplanning, allowing the necessary time to complete tasks correctly the first time, encouraging leadership at the workface, and encouraging workers to take pride in their work are all strategies that promote both safety and quality.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | labor and personnel issues; planning; project management; quality; safety |
| Index terms: | project cost, testing, project scope, project manager, building construction, duration, personnel, injury, project success, strategy, project management, safety performance, construction safety, rework, occupational safety and health, interview, quality performance |
| Subjects: | management, project delivery, environmental health, operations management, professional practice, building construction, project management theory and practice, scope management, occupational health and safety management, project controls, health conditions and diseases, profession, data collection methods, economics |
| Topics: | Project Management, Construction Technology, Health and Safety, Human Resources, Cost Management, Time Control, Business Strategy, Quality Management, Roles and Professions, Research Practice, Engineering Principles, Sustainability |
| Descriptive scope: | 3 PCE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here