Modification of advanced programmatic risk analysis and management model for the whole project life cycle's risks

Zeynalian, M; Trigunarsyah, B and Ronagh, H R (2013) Modification of advanced programmatic risk analysis and management model for the whole project life cycle's risks. Journal of Construction Engineering and Management, 139(1), pp. 51-59. ISSN 0733-9364

Abstract

The advanced programmatic risk analysis and management model (APRAM) is one of the recently developed methods that can be used for risk analysis and management purposes considering schedule, cost, and quality risks simultaneously. However, this model considers those failure risks that occur only over the design and construction phases of a project's life cycle. While it can be sufficient for some projects for which the required cost during the operating life is much less than the budget required over the construction period, it should be modified in relation to infrastructure projects because the associated costs during the operating life cycle are significant. In this paper, a modified APRAM is proposed, which can consider potential risks that might occur over the entire life cycle of the project, including technical and managerial failure risks. Therefore, the modified model can be used as an efficient decision-support tool for construction managers in the housing industry in which various alternatives might be technically available. The modified method is demonstrated by using a real building project, and this demonstration shows that it can be employed efficiently by construction managers. The Delphi method was applied in order to figure out the failure events and their associated probabilities. The results show that although the initial cost of a cold-formed steel structural system is higher than a conventional construction system, the former's failure cost is much lower than the latter's.

Item Type: Article
Uncontrolled Keywords: construction management; risk analysis; risk management
Index terms: construction system, construction manager, Delphi method, housing, design and construction, life cycle, risk management, cold-formed steel, infrastructure project, risk analysis
Subjects: value management, infrastructure and transport systems, risk assessment, profession, building materials, contractual arrangements, building construction, data collection methods, environmental hazards, construction type
Topics: Research Practice, Engineering Principles, Procurement, Roles and Professions, Project Management, Risk Management, Sustainability, Construction Technology
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here