Zhang, L; Pan, C and Zou, X (2013) Criticality comparison between the repetitive scheduling method and the network model. Journal of Construction Engineering and Management, 139(10): 06013004, ISSN 0733-9364
Abstract
Although the repetitive scheduling method (RSM) is more visual and straightforward and is easier to use, the network model is more commonly accepted by both owners and contractors as a means for modeling repetitive projects. In this paper, a method for converting an RSM into an equivalent network model is proposed, and the cause of differing makespans and critical paths in the relevant literature is examined. Using the proposed method for converting an RSM into a network model enables the transfer of both resource continuity requirements and distance constraints. For three different distinguishing cases, a comparison of critical paths and activity criticality is made between an RSM and a network model, with the results showing that the RSM coincides completely with the network in terms of the makespan, critical path, and activity criticality. From this comparison, variances in makespan and criticality in existing literature are caused by the conversion of backward-controlling RSM segments containing two or more subactivities, without maintaining resource continuity. This paper can help researchers to better understand the relationship between these two methodologies. It offers practitioners a method for easily and accurately converting an RSM to a network model when contractually required, and practitioners can accrue the benefits of both methodologies.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | conversion; criticality; distance constraint; network; project planning and design; repetitive scheduling; resource continuity |
| Index terms: | methodology, practitioner, project planning, repetitive scheduling, critical path, modelling, repetitive project, conversion, variance, owner |
| Subjects: | practitioner, control systems, operations research, analytical methods, manufacturing engineering, research methods, production management, measurement and scaling, sociology |
| Topics: | Time Control, Engineering Principles, Project Management, Research Practice, Roles and Professions, Stakeholder Management |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here