Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation

Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364

Abstract

Transportation agencies worldwide have been preparing themselves to face the growing demand for transportation infrastructure by forming public-private partnerships (PPP), contractual agreements formed between public and private sector entities, to allow for greater private sector participation in the delivery of transportation projects. However, there is one major concern that needs to be addressed: the issue of accurately estimating maintenance and rehabilitation costs at the project planning stage. The accuracy of these estimates plays a significant role in determining project characteristics, and in selecting appropriate projects and PPP approaches for implementation, so that they may lead to sustainable highway preservation strategies. This paper compares the contract winning bid cost with the final as-built cost of highway maintenance and rehabilitation projects, determines possible cost overruns across the projects and identifies influential factors that affect them. The analysis is performed separately by PPP contracting approach, and thereby relaxes the assumption of past research that cost overrun behaves identically across different contracting approaches. The results show that a number of factors play a role in the determination of cost overrun, including the project size (cost, duration, and length) and specific maintenance and rehabilitation activities.

Item Type: Article
Uncontrolled Keywords: contracting; cost overrun; highway maintenance and rehabilitation; public-private partnerships; sustainable highway preservation
Index terms: strategy, face, private sector participation, transportation project, accuracy, influential factor, rehabilitation project, project planning, estimating, cost overrun, partnership, private sector, transportation agency, transportation infrastructure, implementation, estimate, duration, agreements
Subjects: management, professional development, partnership management, project controls, health conditions and diseases, industry analysis, infrastructure and transport systems, transportation engineering, risk assessment, control systems, contract formation, stakeholder participation, psychology, contractual arrangements, financial and cost management
Topics: Organizational Design, Contract Administration, Time Control, Stakeholder Management, Risk Management, Procurement, Business Strategy, Cost Management, Health and Safety, Project Management, Engineering Principles, Information Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here