Improving predictability of construction project outcomes through intentional management of indirect construction costs

Becker, T C; Jaselskis, E J and El-Gafy, M (2014) Improving predictability of construction project outcomes through intentional management of indirect construction costs. Journal of Construction Engineering and Management, 140(6): 4014014, ISSN 0733-9364

Abstract

Indirect construction costs (IDCC) comprise from as little as 10 to 40% or more of the total cost of construction projects, in part depending on the type and nature of the project. Yet, any location in this range represents a significant component of total project costs, which justifies the need to better understand and develop effective practices to estimate, control, and manage IDCC. When IDCC practices are not afforded intentional management and appropriate resources, key project performance outcomes are affected. As its unique contribution to the body of knowledge, this paper operationally defines IDCC, outlines certain innovative IDCC practices, and identifies statistically significant relationships between key IDCC practices and project outcome metrics. Empirical recommendations are premised upon data collected through testimonials, structured interviews, and brainstorming sessions of an extensive set of construction industry professionals. Statistical findings are based upon data collected through 56 one-on-one data-collection interviews with subject matter experts and 47 project-level surveys. Qualitative data were filtered, organized, and aggregated and are technically presented as instructional guidelines. Quantitative data were statistically analyzed and results from this analysis show several significant relationships between IDCC practices and key project outcomes, including a positive correlation between the frequency of IDCC review meetings that included project managers and field supervisors and quality and cost performance.

Item Type: Article
Uncontrolled Keywords: construction management; cost and schedule; indirect construction costs; pre-project planning; project controls
Index terms: survey, project cost, interview, project planning, cost performance, body of knowledge, construction project, project outcome, construction cost, project manager, project control, supervisor, estimate, construction industry, project performance
Subjects: financial and cost management, knowledge management, project completion, data collection methods, profession, practitioner, control systems, industry analysis, economics, project management theory and practice, production management
Topics: Cost Management, Research Practice, Project Management, Information Management, Roles and Professions
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here