Framework for work-space planning using four-dimensional BIM in construction projects

Choi, B; Lee, H S; Park, M; Cho, Y K and Kim, H (2014) Framework for work-space planning using four-dimensional BIM in construction projects. Journal of Construction Engineering and Management, 140(9): 04014041, ISSN 0733-9364

Abstract

Each participant in a building construction project requires a dedicated work space in which to execute their activities. In this environment, inappropriate work-space planning in a construction site causes work-space problems, which results in a loss of productivity, safety hazards, and issues of poor quality. Therefore, the work space should be considered one of the most important resources and constraints to manage at a construction site. However, current construction planning techniques have proven to be insufficient for work-space planning because they do not account for the spatial feature of each activity. To establish a formalized work-space planning process, therefore, this paper categorizes work space by its function and movability and suggests a framework for a work-space planning process that contains five phases, including 4D building information model (BIM) generation, work-space requirement identification, work-space occupation representation, work-space problem identification, and work-space problem resolution. The proposed framework in this paper can improve the accuracy of work-space status representation and work-space problem identification by introducing the work-space occupation concept and the integrated work-space planning process that considers characteristics of activity, work space, and construction plan. In addition, this paper aims to ameliorate the work-space planning process through path analysis and a formalized work-space problem resolution process. To validate the proposed approach, a case project was tested. The result shows the efficiency and effectiveness of the proposed framework on improving the work-space planning process. Based on the result of this study, a project manager will be able to prevent possible work-space problems and their negative effects on project performance by devising a pertinent work-space plan during the preconstruction phase.

Item Type: Article
Uncontrolled Keywords: building information model; construction sites; cost and schedule; project management; scheduling; work space
Index terms: scheduling, accuracy, occupation, building construction, construction site, space planning, construction project, project manager, efficiency, productivity, effectiveness, project performance, construction planning, project management, path analysis, resolution
Subjects: profession, operations research, work location, construction planning, management, performance management, production management, design process, project management theory and practice, professional development, conflict resolution, sociology, building construction, statistical analysis
Topics: Time Control, Site Management, Quality Management, Design Practice, Construction Technology, Roles and Professions, Stakeholder Management, Information Management, Research Practice, Project Management, Business Strategy
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here