Lu, W; Ye, K; Flanagan, R and Jewell, C (2014) Nexus between contracting and construction professional service businesses: Empirical evidence from international market. Journal of Construction Engineering and Management, 140(2): 04013049, ISSN 0733-9364
Abstract
The construction market around the world has witnessed the growing eminence of construction professional services (CPSs), such as urban planning, architecture, engineering, and consultancy, while the traditional contracting sector remains strong. Nowadays, it is not uncommon to see a design firm taking over the work of a traditional main contractor, or vice versa, of overseeing the delivery of a project. Although the two sectors of contracting and CPS share the same purpose of materializing the built environment, they are as different as they are interrelated. Much has been mentioned about the nexus between the two but little has been done to articulate it using empirical evidence. This study examined the nexus between contracting and CPS businesses by offering and testing lead-lag effects between the two sectors in the international market. A longitudinal panel data composed of 23 top international contractors and CPS firms was adopted. Surprisingly, results of the panel data analyses show that CPS business does not have a significant positive causal effect on contracting as a downstream business, and vice versa. CPS and contracting subsidiaries, although within the same company, do not necessarily form a consortium to undertake the same project; rather, they often collaborate with other CPS or contracting counterparts to undertake projects. This paper provides valuable insights into the sophisticated nexus between contracting and CPS in the international construction market. It will support business executives' rational decision making for selecting proper contracting or CPS allies, or a proper mergers and acquisitions strategy in the international market. The paper also provides a fresh perspective through which researchers can better investigate the diversification strategies adopted by international contracting and CPS firms.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction professional services; contracting; international construction market; lead-lag effect; organizational issues |
| Index terms: | strategy, data analysis, consultancy, urban planning, evidence, decision-making, acquisition, traditional contracting, merger, design firm, consortium, main contractor, organizational issue, construction market, testing, international construction, international market, built environment, executive, diversification, construction professional |
| Subjects: | decision analysis, partnership management, market analysis, infrastructure and transport systems, management, development economics, professional development, urban planning, professional practice, contractual arrangements, data analysis and analytics, business, organization, evaluation and assessment methods, strategic management, practitioner |
| Topics: | International Construction, Urban Studies, Organizational Design, Engineering Principles, Information Management, Research Practice, Business Strategy, Governance, Procurement, Roles and Professions, Stakeholder Management, Risk Management |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here