Abstract
In hot-mix asphalt (HMA) pavement construction, newly placed pavement must be sufficiently cooled before it can be opened to traffic. Estimation of the time required for pavement to reach a desired temperature level is necessary for highway agencies to make proper specifications and for contractors to plan for daily productions. In this study, energy exchange at the surface of newly laid HMA pavement was modeled as a function of time and weather conditions. Thermodynamics theory and finite-element method were used to model and simulate the cooling process. Field validation indicates that the modeling and simulation results match the observations reasonably well. The analysis procedure developed in this study can be used to predict HMA pavement cooling in different weather conditions. This paper contributes to the understanding of fundamental thermal exchanges in freshly placed HMA pavement, quantification of the influences of weather conditions and time on the thermal exchanges, and realistic estimation of pavement cooling time for better specification and production plans. It also facilitates future exploration of artificial cooling methods by reducing the number of site trials through computer simulations.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | asphalt pavements; construction materials; construction materials and methods; construction methods; cooling |
| Index terms: | estimation, pavement construction, quantification, modelling, construction material, construction method, computer simulation, asphalt pavement, specification, time estimation, weather, agency, validation, exploration |
| Subjects: | operations research, modelling and simulation, building materials, environmental resource management, analytical methods, financial and cost management, air quality, sociology, measurement and scaling, building construction, infrastructure and transport systems, infrastructure engineering, professional development, contractual condition |
| Topics: | Digital Applications, Contract Administration, Time Control, Site Management, Research Practice, Engineering Principles, Information Management, Cost Management, Sustainability |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here