Suggestions for temporary construction facilities' layout problems in large-scale construction projects

Xu, J and Song, X (2014) Suggestions for temporary construction facilities' layout problems in large-scale construction projects. Journal of Construction Engineering and Management, 140(5): 06014001, ISSN 0733-9364

Abstract

Temporary construction facilities' layout problems (TCFLPs) are crucial in large-scale construction projects. Well-designed TCFLPs can improve overall effectiveness and facilitate an efficient construction process. This technical note presents an innovative trilogy for positioning appropriate temporary construction facilities (TCFs) in ideal locations based on a qualitative-quantitative-qualitative methodology. In contrast to previous research, the trilogy integrates existing techniques with some qualitative analysis to facilitate operations so that the operability of TCFLPs in practical situations is improved. First, a qualitative-based analysis index is proposed to determine basic properties for the predetermined project. Following this, optimization models are established to obtain satisfactory solutions based on practical requirements and constraints in a quantitative way. Finally, an evaluation index is built to evaluate and adjust some of the TCFs obtained from the previous procedure to better meet the practical demands. The complete process is illustrated using a realistic layout problem from the Jinping-I hydropower station project in China, and the results show that the proposed combined methods can be applied to real-world TCFLPs.

Item Type: Article
Uncontrolled Keywords: combined qualitative and quantitative methods; innovative trilogy; Jinping-I; project planning and design; temporary construction facilities; temporary construction facilities' layout problems
Index terms: effectiveness, quantitative method, qualitative analysis, methodology, construction process, construction project, project planning, China
Subjects: data analysis and analytics, research design and methodology, control systems, building construction, research methods, performance management, production management, Geography
Topics: Geographical Context, Project Management, Research Practice, Site Management, Quality Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here