Yang, I T; Lin, Y C and Lee, H Y (2014) Use of support vector regression to improve computational efficiency of stochastic time-cost trade-off. Journal of Construction Engineering and Management, 140(1): 04013036, ISSN 0733-9364
Abstract
Stochastic time-cost trade-off has been a popular object of investigation in past decades because there are uncertain factors that can be considered when determining the appropriate trade-off between project completion time and cost. Previous studies, however, have implemented a double loop procedure, which performs optimization in the outer loop and simulation in the inner loop. The double loop procedure is ponderous because it requires an unacceptably long computation time (taking hours or days), even for a small to medium project. The present study proposes an integrated system that converts the double loop to single loops,thereby dramatically reducing computation time. This is done by incorporating a support vector regression model to obtain a decision function, which will be used to replace the time-consuming Monte Carlo simulation to evaluate the objective function values for individual solutions. With the objective function values, a multiobjective particle swarm optimization algorithm is developed to search for the Pareto front composed of nondominated solutions. It has been empirically shown that the proposed system significantly outperforms the conventional double loop procedure because the former can consistently generate a better Pareto front (with a larger hyperarea ratio) hundreds of times faster by using much less computation time. The Student's t test is performed to validate the superiority of the proposed system. The contribution of the proposed system is multifold. First, improved computational efficiency is essential for the widespread acceptance of the stochastic time-cost trade-off analysis in practical applications. Second, with less computation time spent in simulation, efforts can be focused on the search for much better nondominated solutions. Third, the proposed system can incorporate the risk attitudes of the decision makers into the analysis by allowing them to specify the probability that they can tolerate for project duration (cost) to exceed a certain limit.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | cost and schedule; metaheuristic; multiobjective optimization; particle swarm optimization; support vector regression; time-cost trade-off; uncertainty analysis |
| Index terms: | computation, completion time, optimization algorithm, risk attitude, time-cost trade-off, duration, integrated system, investigation, Monte Carlo simulation, uncertainty analysis, efficiency, regression model |
| Subjects: | modelling and simulation, data collection methods, computational methods, design methods, project controls, statistical analysis, environmental hazards, quantity surveying, performance management, algorithms, decision-making and reasoning |
| Topics: | Digital Applications, Design Practice, Quality Management, Time Control, Research Practice, Risk Management, Sustainability |
| Descriptive scope: | 3 PCA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here