Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process

Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364

Abstract

Schedules are major concerns in construction planning and management. The mutual interferences among construction activities of long-distance diversion tunnels (LDDTs) are complicated because of their crisscrossing and intensive layout, which will affect scheduling to some degree. Especially, lithology has a conclusive influence on underground construction. But the lithology determination methods of current construction simulation, such as the trend of extrapolation from observations, do not fully consider lithology's inherent characteristics and the transition probability between different lithological classifications. In the present study, the authors propose a hierarchical simulation model coupling the critical path method (CPM) and cycle operation network (CYCLONE) to arrange the intricate construction sequence of LDDTs. Additionally, a Markov prediction model is embedded into the CYCLONE model as a specific component to consider lithological uncertainty and estimate construction parameters of each cycle automatically. Based on the proposed simulation model, a real-time construction schedule analysis system is built. A case study project is analyzed to demonstrate the feasibility of the methodology and to highlight its capabilities. For this project, a reasonable planned schedule is proposed, an optimal equipment selection is determined, the excavation intensity is balanced, and it is verified that a simulation model considering lithological uncertainty using a Markov process provides a higher level of accuracy in prediction than traditional simulations. Finally, regulatory measures are presented for site management based on the simulation results and the deviations between the actual and planned schedules.

Item Type: Article
Uncontrolled Keywords: construction management; construction scheduling; cost and schedule; decision support systems; diversion tunnels; Markov process; simulation
Index terms: accuracy, prediction model, scheduling, construction simulation, decision support, tunnel, critical path method, excavation, methodology, coupling, construction activity, deviation, case study, cyclone, construction scheduling, equipment selection, construction planning, estimate, underground construction, site management
Subjects: operations research, modelling and simulation, construction operations, financial and cost management, construction planning, prediction and forecasting, data collection methods, climate science, project controls, geotechnical engineering, decision analysis, infrastructure and transport systems, systems engineering, research methods, procurement capability, professional development
Topics: Sustainability, Risk Management, Information Management, Engineering Principles, Research Practice, Cost Management, Site Management, Time Control, Supply Chain Management, Digital Applications
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here