Saurin, T A; Formoso, C T; Reck, R; Beck Da Silva Etges, B M and Ribeiro, J L D (2015) Findings from the analysis of incident-reporting systems of construction companies. Journal of Construction Engineering and Management, 141(9): 501500, ISSN 0733-9364
Abstract
Incident reporting systems (IRSs) are well-known for producing proactive information for safety management. However, there is little guidance on how the analysis of IRSs can provide feedback for improving those systems. Thus, the question addressed in the research reported in this paper is stated as, how can the analysis of IRSs support the identification of opportunities for improving their design? Case studies were carried out in the IRSs of three construction companies. A qualitative analysis of the IRSs was made, based on semistructured interviews, participant observation, direct observation in construction sites, and analysis of documents. A quantitative analysis was made of 946 incidents reported in 16 construction sites. Those events were classified according to types, severity, duration of latent conditions, and number of reports per reporter. The contribution of the research reported in this paper is three-fold, as follows: (1) there were lessons learned from the analysis of IRSs, indicating how existing data could be explored further; (2) based on those lessons, a set of guidelines for the design of IRSs was produced; and (3) quantitative analysis of incident reports was a contribution in itself, given the scarcity of empirical studies about predecessor events of accidents. The findings are expected to be useful for those designing and operating IRSs in the construction industry.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | labor and personnel issues; latent conditions; near-misses; performance measurement; safety management |
| Index terms: | case study, construction site, qualitative analysis, empirical study, documents, construction company, incident reporting, direct observation, personnel, duration, construction industry, safety management, observation, interview, performance measurement, lessons learned, quantitative analysis |
| Subjects: | data analysis and analytics, research design and methodology, performance measurement, data collection methods, financial risk, work location, research methods, professional development, project controls, management, organization, industry analysis, occupational health and safety management |
| Topics: | Quality Management, Human Resources, Cost Management, Site Management, Research Practice, Health and Safety, Time Control, Information Management, Business Strategy |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here