Reducing hindrances to enterprise risk management implementation in construction firms

Zhao, X; Hwang, B G; Pheng Low, S and Wu, P (2015) Reducing hindrances to enterprise risk management implementation in construction firms. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Abstract

Although enterprise risk management (ERM) has been advocated in the construction industry, its implementation is still plagued with hindrances. The objectives are to identify the critical hindrances to ERM implementation in Chinese construction firms (CCFs) and investigate the interrelationships among these critical hindrances. To achieve the objectives, 36 hindrances were identified through a literature review and a questionnaire survey was performed with 119 respondents. The results indicated that 20 hindrances were deemed critical, among which insufficient resources (e.g., time, money, and people) was ranked top. Additionally, the critical hindrances were categorized into lack of relevant resources and procedures (LRRP), lack of senior-level support and leadership (LSSL), and lack of high-quality data (LHQD). LSSL contributed to LRRP, whereas LRRP resulted in LHQD. The managerial implications drawn from these results can help the management take measures to overcome them. Although this study is focused on CCFs, other firms may use the identified hindrances and follow the method to prepare their customized list of hindrances.

Item Type: Article
Uncontrolled Keywords: construction firms; enterprise risk management; factor analysis; hindrance; project planning and design; structural equation modeling
Index terms: implementation, construction industry, factor analysis, enterprise risk management, project planning, questionnaire, structural equation modelling, literature review, survey, construction firm
Subjects: control systems, organization, data collection methods, data analysis and analytics, contractual arrangements, financial risk, statistical analysis, industry analysis
Topics: Cost Management, Business Strategy, Research Practice, Project Management, Procurement
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here