Du, J; El-Gafy, M and Zhao, D (2016) Optimization of change order management process with object-oriented discrete event simulation: Case study. Journal of Construction Engineering and Management, 142(4): 05015018, ISSN 0733-9364
Abstract
Change orders are common to most construction projects. They can significantly increase project cost and duration, leading to more claims and disputes and ultimately creating an adversarial relationship among project members. Evidence has shown that a contributing factor to the inefficiency of change order management is the management process utilized in most construction projects, which always relates to suboptimal allocation of resources and unnecessary procedures. Discrete event simulation (DES) provides an effective approach to streamline the change order management process by evaluating a series of improvement options. Based on a comparison of two prevailing DES paradigms, activity scanning (AS) and process interaction (PI), this paper presents an object-oriented DES model to investigate the change order management process. A case study has been performed to investigate the change order management process at a Midwestern land-grant university with the proposed simulation model, where the bottlenecks of as-is process have been identified and improved. The developed model employs PI paradigm rather than AS paradigm because the former is capable of capturing the real time state changes of change orders. Sensitivity analysis (SA) is also applied to examine the quantitative impacts of changeable variables to evaluate improvement options. The results indicate that PI paradigm outperforms AS in the investigation of change order management process. It is also expected that the developed model provides an optimization tool to support change order management.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | activity scanning; change order; discrete event simulation; object-oriented programming; process interaction; quantitative methods; sensitivity analysis |
| Index terms: | option, land, interaction, duration, investigation, paradigm, real time, change order, dispute, discrete event simulation, case study, programming, quantitative method, evidence, construction project, project cost, sensitivity analysis, change order management |
| Subjects: | dispute resolution, programming, evaluation and assessment methods, data collection methods, data analysis and analytics, modelling and simulation, real estate economics, contract management, production management, contractual condition, economics, education and knowledge transfer, environmental hazards, behavioral psychology, decision analysis, project controls |
| Topics: | Risk Management, Sustainability, Cost Management, Project Management, Research Practice, Contract Administration, Time Control, Legal Issues, Urban Studies, Digital Applications |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here