Exposing uncertainty in bid preparation of steel construction cost estimating: II. Comparative analysis and quantitative C-I-V-I-L classification

Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: II. Comparative analysis and quantitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016050, ISSN 0733-9364

Abstract

Bid prices vary greatly based on assumptions about uncertain conditions. In steel construction bidding, the contingency amount is typically used as a bid line item to factor in the unexpected - including impact of uncertainty - to the lump-sum bid price. Therefore, the goal of this research is to explore the impacts of uncertainties that contribute to contingency amounts. The costs of uncertainties in bid documents of several real-world school projects have been calculated. Contributions to the body of knowledge are (1) providing illustrative examples of real-world uncertainties from the data set; (2) statistically analyzing the relative occurrence and cost significance to increase estimators' awareness when they evaluate uncertainties; and (3) comparing the cost significance from the data with officially recommended contingency percentages. This research enables steel estimators to make quantitative-based decisions on contingencies in their estimates should various major types of uncertainties arise without an opportunity to resolve them.

Item Type: Article
Uncontrolled Keywords: bid accuracy; bid document; bid uncertainty; construction estimating; cost and schedule; quantity takeoff; structural steel
Index terms: construction estimating, documents, estimator, body of knowledge, steel construction, bidding, bid preparation, cost estimating, comparative analysis, accuracy, estimate, cost significance
Subjects: professional development, structural engineering, profession, bidding, knowledge management, data analysis and analytics, financial and cost management
Topics: Procurement, Roles and Professions, Research Practice, Engineering Principles, Information Management, Cost Management
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here