Hajifathalian, K; Howell, G; Wambeke, B W; Hsiang, S M and Liu, M (2016) Oops simulation: Cost-benefits trade-off analysis of reliable planning for construction activities. Journal of Construction Engineering and Management, 142(8): 4016030, ISSN 0733-9364
Abstract
"The Oops Game" explores the question, how much should be invested in planning? The simulation offers the opportunity to reduce the risk of an Oops by collecting more information or to go ahead and make the choice with the information at hand. There are two extreme strategies. Nothing is invested in planning in the so-called Guts-ball approach, but this increases the likelihood that an Oops will occur and thus increases the cost to complete the project. The second strategy is to invest in planning before attempting to build. This will increase the cost of planning upfront, but may reduce the risk and cost of an Oops in building. In reality, the cost and value of planning depends on the complexity level of the project, the amount of uncertainty that we need to deal with it, and the cost of an Oops We used computer simulation to show how the value of planning is sensitive to those factors. The results showed that the project with the reliable planning strategy had a 35% higher productivity and a cost-benefit ratio of 13-1. The contribution to the body of knowledge of The Oops Game lies in providing a simple and effective means to show the value of planning to construction practitioners and students. The findings from this research fill in the gap of knowledge in quantifying the value of plan under different circumstance for construction projects.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | computer aided simulation; cost of project; labor and personnel issues; performance reliability; planning; productivity |
| Index terms: | computer simulation, strategy, construction practitioner, personnel, body of knowledge, complexity, construction project, productivity, construction activity, computer aided simulation |
| Subjects: | production management, professional development, management, systems engineering, knowledge management, construction operations, modelling and simulation |
| Topics: | Information Management, Engineering Principles, Project Management, Business Strategy, Site Management, Human Resources, Digital Applications |
| Descriptive scope: | 3 PCA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here