Joukar, A and Nahmens, I (2016) Volatility forecast of construction cost index using general autoregressive conditional heteroskedastic method. Journal of Construction Engineering and Management, 142(1): 04015051, ISSN 0733-9364
Abstract
The Engineering News-Record (ENR) publishes the Construction Cost Index (CCI) monthly, which is a composite index of 20-city average price of construction activities in the United States. Cost estimators use this index frequently to estimate the cost of construction projects. The CCI forecast provides contractors with more accurate bids. It also helps owners with their projects' budgeting. Previous studies have forecasted this index via multivariate and univariate techniques. Homogeneity of variance is assumed on these techniques, however the CCI shows periods of substantial volatility. So far the standard tools used to address volatility on time series have been the autoregressive conditional heteroskedasticity (ARCH) and generalized autoregressive conditional heteroskedasticity (GARCH) models. In this study, a seasonal historical data set of ENR Construction Cost Index is analyzed in order to extract and forecast volatilities of the CCI in the short term. Results of this study show high and persistent volatility of the CCI in the cases of economic shocks. The maximum of the conditional variances over the entire sample period (January 1987 to July 2012) occurred in October 2008. The variance equation shows that both lags of residuals and the lag of GARCH term are highly significant, implying that the volatility of risk is influenced by past square residual terms as well as current variance of the series.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction cost index; forecast; generalized autoregressive conditional heteroskedasticity; quantitative methods; volatility |
| Index terms: | variance, construction project, quantitative method, composite, construction cost index, estimate, owner, cost estimator, United States, construction activity, time series, budgeting |
| Subjects: | production management, financial and cost management, data science, profession, cost indicators, materials science, measurement and scaling, financial management, sociology, Geography, data analysis and analytics, construction operations |
| Topics: | Construction Materials, Cost Management, Geographical Context, Project Management, Site Management, Stakeholder Management, Business Strategy, Research Practice, Design Practice, Roles and Professions |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here