Lu, W; Zhang, L and Zhang, L (2016) Effect of contract completeness on contractors' opportunistic behavior and the moderating role of interdependence. Journal of Construction Engineering and Management, 142(6): 04016004, ISSN 0733-9364
Abstract
The characteristics of construction projects - e.g., one-off, high complexity, information asymmetry, and asset specificity - have led to a very common phenomenon of opportunism. In this paper, a questionnaire based on a sample of contractors was employed to explore the effect of contract completeness on contractors' opportunistic behavior, as well as the moderating role of interdependence. The results show that term specificity, contingency adaptability, and contractual obligatoriness all have negative effects on contractors' opportunistic behavior (both weak and strong forms), while issue inclusiveness positively influences contractors' opportunistic behavior. In addition, except for the positive moderating role of interdependence magnitude on the relationship between contingency adaptability and contractors' opportunistic behavior (weak form), the other three significant moderating effects (magnitude on issue inclusiveness and strong form, magnitude on contractual obligatoriness and strong form, asymmetry on term specificity and strong form) are all found to be negative. These findings can give insight into the many ways that contracts affect opportunism, and thus help both sides strategically react to opportunistic disturbances and minimize transaction costs.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | contract completeness; contracting; interdependence; opportunistic behavior |
| Index terms: | transaction cost, information asymmetry, opportunism, contract completeness, complexity, questionnaire, adaptability, construction project, asset specificity, interdependence, opportunistic behaviour |
| Subjects: | organizational analysis, financial analysis, systems engineering, contract structure, economic concepts, production management, data collection methods, transaction economics, user focus, business |
| Topics: | Business Strategy, Cost Management, Engineering Principles, Research Practice, Project Management, Contract Administration, Organizational Design, Design Practice |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here