Luo, X; Li, H; Huang, T and Skitmore, M (2016) Quantifying hazard exposure using real-time location data of construction workforce and equipment. Journal of Construction Engineering and Management, 142(8): 4016031, ISSN 0733-9364
Abstract
Traditional risk-assessment methods typically evaluate accident probability, exposure frequency or duration, and consequence severity, respectively, and finally determine a quantitative risk score or a qualitative risk level. The assessment process is prospective and subjective. Changing and complex construction situations impede their practical and efficient application. To assess safety risk with regard to changing site conditions in an objective and efficient way, this study proposes a quantitative model for hazard exposure assessment based on real-time location data of construction workforce and equipment, collected by a location-based proximity warning system. In contrast with traditional risk-assessment methods, the model proposed in this study combines accident probability and hazard exposure duration into a single quantitative concept - hazard exposure amount. This concept takes into account the space factor as well as the time factor of construction activities. For ease of understanding, a hazard is analogized as a radiation source and the hazard exposure is then referred to as the radiation quantity received. The longer duration and closer proximity in which a person is exposed to a radiation (hazard), the more radiation the person receives (the higher risk to which the person is exposed). A trial study is described in which a proximity warning system was developed and used to demonstrate and test the model's capability of hazard exposure assessment. This shows that the system can provide safety officers with an ongoing and immediate means of comparing safety risk trends from worker, hazard, and project perspectives.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction safety; labor and personnel issues; proximity warning systems; quantitative hazard exposure; real-time location; risk assessment |
| Index terms: | construction activity, risk assessment, duration, personnel, exposure, construction safety |
| Subjects: | construction operations, public and environmental health, management, financial risk, project controls, environmental health |
| Topics: | Sustainability, Health and Safety, Cost Management, Time Control, Site Management, Human Resources |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here