A fuzzy-based integrated framework for assessing time contingency in construction projects

Pawan, P and Lorterapong, P (2016) A fuzzy-based integrated framework for assessing time contingency in construction projects. Journal of Construction Engineering and Management, 142(3): 04015083, ISSN 0733-9364

Abstract

Assessing time contingency is an important part of construction project scheduling because it helps generate a more reliable schedule. Traditionally, the assessment is made using expert judgment and inherently inserted to the estimated activity duration and/or comprehensively placed at the project level. This practice has a major drawback in that project-specific risks that require time contingency are not explicitly identified and treated. Risk management is performed in isolation to project scheduling. This paper presents a new framework for assessing the time contingency required for activities exposed to multiple risks. Fuzzy set theory is employed to model the imprecision and vagueness associated with the possibility of risk occurrence and the impact of those risks on activity durations. Alternative risk responses can be explored and their impacts on the project duration can be evaluated. A real-life case example was used to demonstrate the application of the framework. The results indicate that risk management can systematically be incorporated into scheduling. The impact of multiple risks on activity time contingency can effectively be estimated. The robustness of the schedule can be enhanced through iterative response planning. The newly developed framework thus provides construction planners with a practical tool for proactively assessing the impact of the project-specific risks on major milestones and project deadlines. This study advances the current practice of time contingency estimations by introducing an integrated approach for risk management and project scheduling. It also advances the application of fuzzy sets theory in assessing impact on activity durations subjected to multiple risks.

Item Type: Article
Uncontrolled Keywords: activity duration; cost and schedule; fuzzy set; risk management; scheduling; time contingency
Index terms: fuzzy set, duration, risk response, construction project, fuzzy set theory, construction planner, judgment, risk management, project scheduling, estimation, scheduling, integrated approach
Subjects: operations research, financial and cost management, decision-making and optimization, financial risk, contractual arrangements, risk assessment, dispute resolution, production management, practitioner, project controls
Topics: Roles and Professions, Legal Issues, Research Practice, Risk Management, Cost Management, Project Management, Time Control, Procurement
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here