Quantitative performance assessment of single-step versus two-step design-build procurement

Ramsey, D; El Asmar, M and Gibson, G E (2016) Quantitative performance assessment of single-step versus two-step design-build procurement. Journal of Construction Engineering and Management, 142(9): 04016033, ISSN 0733-9364

Abstract

Design-build (DB) is an alternative project delivery system that is distinguished by a DB team acting as the single point of responsibility for a project in which the design and construction phases overlap. There are two main methods used to procure DB services: single-step and two-step procurement. Single-step DB involves a request for proposal (RFP) phase, whereas two-step DB involves both request for qualifications (RFQ) and RFP phases. There is an industry perception that more resources are spent to procure single-step DB projects as compared with two-step DB projects. Therefore, this paper focuses on quantifying the resource expenditures and efficiency impacts of single-step and two-step DB through investigating several procurement and project performance metrics. The paper presents results stemming from 32 completed projects. The results of the analysis show that the total cost to industry to develop single-step proposals is approximately 5% of the total project cost, whereas the cost to develop two-step proposals is approximately 1% of the total project cost. Additionally, the relative procurement duration was 18% of the total project time for single-step DB and 22% of the total project time for two-step DB. Moreover, the percentage of design completed at the RFP and award stages are presented. For single-step DB, 23% of the design was completed at the RFP stage, and 43% at the award stage. For two-step DB, 12% of the design was completed at the RFP stage, and 32% at the award stage. Most importantly, the findings contribute to the DB body of knowledge by quantifying a significant five-fold procurement cost difference between the two DB procurement methods, helping the industry implement procurement policy changes.

Item Type: Article
Uncontrolled Keywords: contracting; contracts; performance; procurement; project delivery
Index terms: duration, project delivery, performance assessment, design and construction, project performance, efficiency, procurement method, qualification, body of knowledge, project cost, procurement policy, proposal
Subjects: project delivery, project planning, contractual arrangements, knowledge management, public policy, project management theory and practice, educational resources, performance management, economics, assessment methods, project controls
Topics: Time Control, Education, Quality Management, Human Resources, Procurement, Governance, Project Management, Information Management, Cost Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here