Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules

Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364

Abstract

Assessment of budget sufficiency and resource utilization for a resource-constrained project schedule is crucial to ensure practical feasibility of the schedule and successful delivery of a construction project. This paper proposes a quantitative assessment approach for characterizing budget sufficiency and resource utilization for a resource-constrained project schedule in an objective fashion. The budgeted unit, deployed unit, and scheduled unit in connection with a resource-constrained project schedule are first defined. Next, two budget sufficiency metrics, named the budget sufficiency index and budget sufficiency variance, are defined for measuring the sufficiency of control budget in terms of deploying resources to execute the project schedule with resource constraints. In addition, two resource utilization metrics, termed the resource utilization index and resource utilization variance, are defined for indicating utilization efficiency of deployed resources based on the schedule. The proposed metrics are applied to objectively assess multiple alternative resource-constrained project schedules derived from various approaches, including a practical scheduling approach (Primavera P6) and resource scheduling optimization techniques recently developed from in-house research. A textbook example and a refinery plant turnaround project are used to demonstrate the effective application of proposed metrics on alternative resource-constrained schedules. It is concluded that (1) resource scheduling optimization techniques outperform Primavera P6 in terms of budget sufficiency and resource utilization thanks to streamlining resource supply limits and shortening project duration by optimization; and (2) a significant portion of the idled resource time in the Primavera P6 schedule turns into extra contingency in the optimized schedule that can be reserved against any work unforeseen or unknown during the planning stage.

Item Type: Article
Uncontrolled Keywords: budget sufficiency; control budget; optimization; project planning and design; project scheduling; resource constraints; resource utilization
Index terms: variance, optimization technique, resource utilization, project scheduling, efficiency, streamlining, project planning, scheduling, resource scheduling, duration, resource constraint, construction project, turnaround project
Subjects: operations management, site logistics, control systems, project controls, production management, algorithms, management, operations research, project rescue, measurement and scaling, performance management
Topics: Time Control, Quality Management, Project Management, Risk Management, Digital Applications, Site Management, Business Strategy, Research Practice
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here