Implementation of 3D integration model for project delivery success: Case study

Ghanbaripour, A N; Langston, C and Yousefi, A (2017) Implementation of 3D integration model for project delivery success: Case study. Journal of Construction Engineering and Management, 143(8): 05017012, ISSN 0733-9364

Abstract

The means for assessing what constitutes successful project delivery is a controversial topic in the literature, with many approaches and frameworks in play. This paper extends an existing three-dimensional (3D) integration model to include an assessment of triple-bottom-line (TBL) performance and applies it, for the first time, to a real-life case study. A subway station megaproject in Tehran, Iran, one of the busiest cities in the world, is retrospectively tested to evaluate its success. The new subway system is an important infrastructure project in Iran, and no research to date has evaluated its delivery from a project-management perspective. This paper provides governmental and private-sector agencies with a procedure to calculate the project delivery success (PDS) score for the construction of this subway or similar infrastructure projects, enabling a unique means to compare performance with other developments in Iran or elsewhere. From field data, it is shown by the researchers and verified by both the site project manager and client's representative that the subway's construction is an unsuccessful project. The findings quantify what could have been done, based on advice generated from the model, to deliver a successful outcome. The benefit of the utilized 3D integration model is its applicability to any project type or context, enabling them to be effectively compared and ranked by the percentage change between planned and actual PDS score. Given the introduction of TBL as a fifth core project constraint, an optimum solution can be found via the application of several heuristics (or rules) that define the boundaries within which a successful solution lies. The extended model contributes to knowledge through its ability to quantify success and optimize performance, ideally during the delivery of the project rather than as a postmortem exercise.

Item Type: Article
Uncontrolled Keywords: construction; cost and schedule; Iran; project delivery success; project integration; project management body of knowledge guide
Index terms: boundaries, megaproject, agency, body of knowledge, integration, project constraint, project management, project delivery, infrastructure project, implementation, Tehran, exercise, case study, project manager, heuristic
Subjects: project delivery, strategic project management, property law, knowledge management, contractual arrangements, health behaviours and lifestyles, control systems, risk assessment, profession, data collection methods, infrastructure and transport systems, sociology, organizational analysis, project management theory and practice, Geography
Topics: Legal Issues, Organizational Design, Information Management, Engineering Principles, Project Management, Geographical Context, Research Practice, Health and Safety, Procurement, Roles and Professions, Risk Management
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here