Moon, S; Zekavat, P R and Bernold, L E (2017) Dynamic quality control of process resource to improve concrete supply chain. Journal of Construction Engineering and Management, 143(5): 04016130, ISSN 0733-9364
Abstract
The latest literature on quality management in the construction industry asserts that it has not been embraced as a holistic approach to improve overall performance. It is felt that management's insistence on punch-list inspection creates barriers to adopting the model that fosters a culture of constant improvement embraced by total quality management (TQM). With this recognition, this research paper presents a model that extends the output-oriented process model to pursue continuous improvement along the supply chain. Extensive field observations and discussions with contractors show that the ready-mixed concrete supply and placement suffers the loss of information when concrete is delivered in truckloads and sampled for quality testing in the laboratory. Without recording the spatial boundaries of a truck volume of poured concrete, a failing quality report leads to large costs for core-drilling to find the location of the unacceptable concrete poured 28 days earlier. The latter part of the paper will present the work to design and field-experiment a feedforward control method that also served as a novel electronic as-built documenter. Ruggedized radio-frequency identification (RFID) tags were added (embedded) as the concrete flowed from the truck into the hopper of the pump. A hand-held RFID reader not only detected 14 out of the 15 embedded tags, but the tags' readability served as an indicator of the concrete's curing progress. The unique contribution of this research project can be seen in the experimental work established by the feasible evidence measured from a real-world construction context. In order to overcome the ingrained view of reactive inspection in concrete supply chains, this research offers a proposed approach whereby its workability is evaluated through first-hand examination.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | concrete curing; concrete technology; construction materials and methods; embedded sensors; feedforward information; process resource; radio-frequency identification; supply chain |
| Index terms: | inspection, continuous improvement, control method, quality management, testing, construction industry, quality control, concrete supply, holistic approach, construction material, experiment, feedforward, workability, total quality management, laboratory, placement, research paper, concrete technology, boundaries, curing, evidence, drilling |
| Subjects: | performance measurement, management, concrete and cementitious materials, monitoring and control, research management, building construction, industry analysis, quality assurance, research dissemination and communication, data collection methods, evaluation and assessment methods, business, construction logistics, design methods, control systems, building materials, property law, professional practice, evaluation methods, project delivery |
| Topics: | Design Practice, Legal Issues, Quality Management, Human Resources, Supply Chain Management, Business Strategy, Research Practice, Engineering Principles, Information Management, Construction Materials, Construction Technology |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here