Moussavi Nadoushani, Z S; Hammad, A W A and Akbarnezhad, A (2017) Location optimization of tower crane and allocation of material supply points in a construction site considering operating and rental costs. Journal of Construction Engineering and Management, 143(1): 04016089, ISSN 0733-9364
Abstract
The choice of a suitable tower crane along with its location may considerably affect the costs and duration of the construction process. The location of the tower crane determines the travel time of transporting material between the supply and demand points and thus the operation costs. On the other hand, the distance between the tower crane and supply points as well as the distance between the tower crane and demand points considerably affects the minimum required load moment capacity of the cranes and thus the cranes' rental and operating costs. Previous studies on optimizing the location of tower cranes on a construction site have focused mainly on minimizing the crane operation costs through minimizing their operation time, overlooking the effect of tower crane location on its required capacity and thus rental and operation costs. This paper presents a modified crane location optimization model that also accounts for the effects of crane location on its required capacity, on top of operating time, when minimizing the total costs of lifting operations. A mixed-integer programming model is developed and applied to an actual case study to illustrate the importance of accounting for the effect of crane location on its required capacity in crane location optimization. Furthermore, using a hypothetical case study, the presence of substantial differences between the weights of the elements required at different demand points is identified as an important project-specific parameter affecting the magnitude of the errors occurred by overlooking the capacity requirements and its effects on rental and operating costs in the crane location optimization problem.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | layout optimization; mixed-integer programming; operating costs; project planning and design; rental costs; tower crane |
| Index terms: | project planning, accounting, lifting, construction process, construction site, integer programming, duration, operating cost, presence, tower crane, case study, supply and demand |
| Subjects: | building construction, project controls, occupational health and safety management, market analysis, algorithms, maintenance engineering, work location, economic analysis, environmental science, data collection methods, control systems |
| Topics: | Sustainability, Health and Safety, Business Strategy, Research Practice, Project Management, Time Control, Site Management, Digital Applications |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here