Database-supported and web-based visualization for daily 4D BIM

Park, J; Cai, H; Dunston, P S and Ghasemkhani, H (2017) Database-supported and web-based visualization for daily 4D BIM. Journal of Construction Engineering and Management, 143(10): 04017078, ISSN 0733-9364

Abstract

Four-dimensional (4D) building information modeling (BIM) (3D BIM plus time) is a powerful tool to visualize and communicate construction plans and milestones. A potential use of 4D BIM is to support daily construction operations and progress monitoring and tracking based on the premise that the latest version of the 4D model including daily construction progress is shared among the project participants. However, in the current practice, file-based 4D BIM has limitations in sharing and visualizing the latest construction progress information in a timely manner because of information delay and data inconsistency issues. Leveraging the advancements in the Web and database technologies, this paper presents a Web and database-supported visualization method that enables real-time information sharing of daily 4D BIM. A central database structure that contains an automatic determination and update method for each BIM object visualization is designed to facilitate the display of daily 4D BIM. The newly created method is demonstrated through the implementation of a real construction project schedule and a 3D BIM. Results illustrate that the method overcomes the information delay and data inconsistency issues associated with file-based 4D BIM to enable the sharing and visualization of daily 4D BIM in real time. The newly developed platform also facilitates timely decision making by enhancing communications and collaborations among project participants regarding daily construction operations and progress.

Item Type: Article
Uncontrolled Keywords: database; four-dimensional building information modeling; industry foundation classes; information technologies; web viewer
Index terms: platform, building information modelling, construction operation, database, real time, industry foundation classes, real-time information, implementation, decision-making, construction project, collaboration, progress monitoring, information technology, visualization
Subjects: contractual arrangements, construction operations, computing systems, computational design, information systems, decision analysis, project controls, data management, digital design, production management, design practice, management
Topics: Design Practice, Digital Applications, Site Management, Organizational Design, Time Control, Project Management, Risk Management, Procurement
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here