Swei, O; Gregory, J and Kirchain, R (2017) Probabilistic approach for long-run price projections: Case study of concrete and asphalt. Journal of Construction Engineering and Management, 143(1): 05016018, ISSN 0733-9364
Abstract
Practitioners increasingly use pavement management systems for determining the allocation of resources for multidecade investments. One important and uncertain input that will affect decisions in these frameworks is future changes in cost for rehabilitation and reconstruction actions. Despite this, existing paradigms overlook its consideration largely because little research to date has evaluated the performance of forecasting over extended time horizons. Therefore, the contribution of this study is the demonstration (via a case study) of the long-term fidelity of probabilistic price projections relative to current practice. Two paving materials, asphalt and concrete, are projected through a probabilistic hybrid forecasting model that convolves conventional forecasts for underlying constituent prices and a long-term price equilibrium relationship between commodities. Out-of-sample forecasts are conducted to test the performance of the proposed model in estimating future prices in terms of their (1) expectation and (2) prediction interval. Results indicate that the hybrid model performs similarly to current practice in terms of expectation while, and perhaps more importantly, providing theoretical uncertainty bounds that matched well with future volatility. The latter result suggests the probabilistic forecasting models developed could potentially augment current pavement management tools, allowing decision-makers to make more informed allocation choices.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | cointegration; econometrics; forecasting; pavements; quantitative methods; time-series |
| Index terms: | management system, practitioner, paving, case study, cointegration, forecasting, estimating, econometric, paradigm, quantitative method, reconstruction |
| Subjects: | data collection methods, prediction and forecasting, financial and cost management, management, transportation engineering, building construction, education and knowledge transfer, data analysis and analytics, practitioner, economic analysis |
| Topics: | Engineering Principles, Cost Management, Business Strategy, Organizational Design, Roles and Professions, Research Practice |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here