Comparing the performance quality of design-bid-build and design-build delivery methods

Yu, T; Shen, G Q and Shi, Q (2017) Comparing the performance quality of design-bid-build and design-build delivery methods. Journal of Construction Engineering and Management, 143(4): 04016111, ISSN 0733-9364

Abstract

The choice of delivery method is one of the most important decisions that can determine the quality of construction projects. Two basic delivery methods, design-bid-build and design-build, have been compared in terms of project quality; however, an important quality dimension, performance quality, has generally been ignored in previous studies. In this study, the authors used existing economic theories to develop a model to examine the performance quality and project profits of these two delivery methods. The equilibrium points of the model were analyzed with consideration given to influencing factors such as cost coefficient, cooperation efficiency, and coordination cost. Four propositions were made to facilitate the quality-profit comparisons between design-bid-build and design-build. The first proposition showed that to maximize personal profit, the project coordinator should always keep a balance between design quality and construction quality, regardless of the delivery method. The other three propositions indicated that both methods can generate relatively higher levels of performance quality and project profits in an appropriate project environment. Based on these propositions, the authors ranked the performance quality and profits of the two methods within different conditions and used a real project to exhibit the practical value of these findings. Via case study, cooperation efficiency was identified as the most critical factor that determines the selection of delivery method. In addition, three key steps were summarized to facilitate the application of the model developed in this study.

Item Type: Article
Uncontrolled Keywords: contracting; design-bid-build; design-build; economic theories; performance quality; project profits; quality-profit equilibrium points
Index terms: efficiency, profit, critical factor, delivery method, case study, dimension, design-build delivery, influencing factor, economic theory, construction quality, cooperation, coordination, design-bid-build, design quality, construction project
Subjects: psychology, quality assurance, professional practice, delivery method, production management, contractual arrangements, health monitoring assessment and metrics, economic analysis, management, performance management, risk assessment, data collection methods
Topics: Health and Safety, Project Management, Business Strategy, Organizational Design, Risk Management, Research Practice, Design Practice, Procurement, Quality Management
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here