Zhang, S; Bogus, S M; Lippitt, C D and Migliaccio, G C (2017) Estimating location-adjustment factors for conceptual cost estimating based on nighttime light satellite imagery. Journal of Construction Engineering and Management, 143(1): 04016087, ISSN 0733-9364
Abstract
A fundamental process in construction cost estimation is the appropriate adjustment of costs to reflect project location. Unfortunately, location adjustment factors are not available for all locations. To overcome this lack of data, cost estimators in the United States often use adjustment factors from adjacent locations, referred to as the nearest neighbor (NN) method. However, these adjacent locations may not have similar economic conditions, which limit the accuracy of the NN method. This research proposes a new method of using nighttime light satellite imagery (NLSI) to estimate location adjustment factors where they do not exist. The NLSI method for estimating location adjustment factors was evaluated against an established cost index database, and results show that NLSI can be used to effectively estimate location adjustment factors. When compared with NN and other alternative proximity-based location adjustment methods, the proposed NLSI method leads to a 25-40% reduction of the median absolute error. This work contributes to the body of knowledge by introducing a more accurate method for estimating location adjustment factors which can improve cost estimates for construction projects where location adjustment factors do not currently exist.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction costs; cost and schedule; estimation; pricing; remote sensing |
| Index terms: | cost estimator, cost estimate, estimate, remote sensing, estimation, cost index, database, construction cost, pricing, economic condition, estimating, satellite, body of knowledge, construction project, accuracy, cost estimating, United States |
| Subjects: | data management, networking, professional development, Geography, production management, research products and data, economic analysis, financial and cost management, knowledge management, profession |
| Topics: | Geographical Context, Project Management, Information Management, Engineering Principles, Cost Management, Business Strategy, Sustainability, Roles and Professions, Digital Applications |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here