Optimizing the scheduling of repetitive construction to minimize interruption cost

Altuwaim, A and El-Rayes, K (2018) Optimizing the scheduling of repetitive construction to minimize interruption cost. Journal of Construction Engineering and Management, 144(7): 4018051, ISSN 0733-9364

Abstract

This paper presents the development of a novel optimization model for the scheduling of repetitive construction projects. The model provides original and unique capabilities that enable planners to search for and identify an optimal/near optimal schedule that simultaneously minimizes project duration, crew work interruptions, and interruption costs. The model computations are organized in four major modules: (1) an optimization module that searches for and identifies a near optimal schedule that simultaneously minimizes the project duration, work interruptions, and interruption costs; (2) an initial scheduling module that calculates the early start date and work-continuity total float for each activity in all of its repetitive sections; (3) an intermediate scheduling module that generates a set of feasible schedules that simultaneously minimize project duration and work interruptions; and (4) an interruption cost module that calculates total interruption cost for each of the generated schedules. An application example of a repetitive construction project is analyzed to evaluate model performance and demonstrate its capabilities in optimizing the scheduling of repetitive construction projects.

Item Type: Article
Uncontrolled Keywords: construction management; genetic algorithms; linear scheduling; optimization; repetitive construction; resource-driven scheduling
Index terms: computation, repetitive construction, duration, module, linear scheduling, planner, genetic algorithm, scheduling
Subjects: building construction, algorithms, computational methods, operations research, project controls, architectural elements, profession
Topics: Digital Applications, Roles and Professions, Time Control, Design Practice, Construction Technology
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here